Tuesday, January 25, 2011

Busy Days!



-- Hair Update -- This is the back of my head. This is how much hair I have so far. It has a bit less color around my face than it does back here (not that there is an over abundance of color back here). I am looking forward to not wearing the wigs, however the long one has been met with the greatest approval!
Monday I left school and went to radiation. I did radiation and x-rays. Then I met with the radiation doctor. I hurried back to school for a title I meeting. Today after school I went to a grade level meeting, hurried to radiation, and then went back to school for another meeting which ended at 5:45. Thank you Laura F., Charme', Pam, Laura W., Tami, and Amy for your input, help, and flexibility.
Ken is upstairs working on the bathroom leak. The first picture is the dressing area. Last night I could see floor joist in this area. The second picture is the shower floor. The pan, which is concrete that was poured under the shower area has to come out and all the tile will have to be replaced. Which also means the pan will have to be repoured before the tile goes in. What a job! More decisions will have to be made about the tile. We are talking about a heat pad under the tile in the dressing area. Ken is looking into it. The pad isn't so bad, but the thermostat makes up for it. We will see. I am off to take a shower downstairs. Which makes me wonder - Why do we have two floors? Hmm!

No comments:

Post a Comment